Industry insights

What to include in a solar street light tender pack

Dec 2025 Shenzhen engineering team 1 min read
Back to Media Center

For overseas tenders, technical completeness often matters as much as price. This checklist reflects common municipal and campus RFP requirements — adapt to owner templates.

Optics and performance

  • IES / LDT files with road-class notes
  • DIALux or equivalent simulation captures (if required)
  • Autonomy calculations with stated sun hours and rainy days

Structure and installation

  • Exploded or general-arrangement drawings, pole flange dimensions
  • Installation guide and foundation embed requirements
  • Cable spec, earthing and surge notes

Compliance and commercial

  • CE / RoHS and other test report summaries
  • Warranty terms, spare parts list and response SLA
  • English datasheets, quotation and lead-time commitment

Request the pack 2–3 weeks before bid submission to allow translation and stamping. Our Shenzhen factory bundles files per model and can join owner technical clarifications.

Related articles

Explore more news and insights from our team

Industry insights

What to include in a solar street light tender pack

Dec 2025 Shenzhen engineering team 1 min read
What to include in a solar street light tender pack

For overseas tenders, technical completeness often matters as much as price. This checklist reflects common municipal and campus RFP requirements — adapt to owner templates.

Optics and performance

  • IES / LDT files with road-class notes
  • DIALux or equivalent simulation captures (if required)
  • Autonomy calculations with stated sun hours and rainy days

Structure and installation

  • Exploded or general-arrangement drawings, pole flange dimensions
  • Installation guide and foundation embed requirements
  • Cable spec, earthing and surge notes

Compliance and commercial

  • CE / RoHS and other test report summaries
  • Warranty terms, spare parts list and response SLA
  • English datasheets, quotation and lead-time commitment

Request the pack 2–3 weeks before bid submission to allow translation and stamping. Our Shenzhen factory bundles files per model and can join owner technical clarifications.

Need a solar street light solution?

Contact our engineers for quotations, IES files and technical consultation.

Explore more news and insights from our team